• AWWA JAW6148
Provide PDF Format

Learn More

AWWA JAW6148

  • Journal AWWA - Expanding Computer Applications to Reduce Energy Consumption
  • Journal Article by American Water Works Association, 03/01/1981
  • Publisher: AWWA

$15.00$30.00


Where a digital computer is installed in a plant for monitoring treatment operations, the application can be augmented to include power and energy monitoring. The operator can utilize digital displays of energy and power usage to control costs while maintaining treatment, quality, and demand levels. Four major factors of the plant electric bill include energy charge, fuel adjustment charge, demand charge, and power factor adjustment. These are described with respect to basic definitions and recommendations toward cost reduction. Includes 8 references, figures.

Related Products

AWWA WQTC69450

AWWA WQTC69450

Indirect Economic Impacts in Water Supplies Augmented with Desalinated Water..

$12.00 $24.00

AWWA ACE65612

AWWA ACE65612

Membrane Product-Specific Testing under LT2 and ETV Protocol..

$12.00 $24.00

AWWA WQTC71462

AWWA WQTC71462

Comparison of Haloacetic Acids Methods USEPA 557 IC-MS/MS and USEPA 552 GC-ECD from Three Drinking W..

$12.00 $24.00

AWWA WQTC69476

AWWA WQTC69476

Pathogen Transport in Porous Media: The Role of Experimental Design, Ionic Strength, and NOM..

$12.00 $24.00