• AWWA JAW6584
Provide PDF Format

Learn More

AWWA JAW6584

  • Journal AWWA - Saving Time During Master Plans and Feasibility Studies
  • Journal Article by American Water Works Association, 04/01/1982
  • Publisher: AWWA

$15.00$30.00


Several causes of delay associated with producing master plans and feasibility studies for water and sanitation projects in developing countries are examined for consideration by governments, consultants, and financing agencies. Such delays are strongly related to cost overruns. Includes 2 references, tables.

Related Products

AWWA ACE58090

AWWA ACE58090

Minimizing Energy Consumption through Valve Selection..

$12.00 $24.00

AWWA WQTC58936

AWWA WQTC58936

Optimization Beyond Turbidity - Fine-Tuning the Disinfection Process and Control of Byproduct Format..

$12.00 $24.00

AWWA JAW30408

AWWA JAW30408

Journal AWWA - The Effect of Soils on the Permeation of Plastic Pipes by Organic Chemicals..

$15.00 $30.00

AWWA ACE99368

AWWA ACE99368

Chlorine Dioxide: An Attractive Alternative for Algae Control in Open, Finished-Water Reservoirs..

$12.00 $24.00