• AWWA JAW6605
Provide PDF Format

Learn More

AWWA JAW6605

  • Journal AWWA - Prequalifying Construction Contractors
  • Journal Article by American Water Works Association, 05/01/1982
  • Publisher: AWWA

$15.00$30.00


Standards and procedures for prequalifying general contractors who are permitted to bid on construction contracts, particularly for public projects, are discussed by an official of the Colorado Contractors Association. Advantages of prequalification are that all bidders will be competent, with adequate resources to accomplish the job, and the cost of soliciting bids is also reduced. Includes 9 references.

Related Products

AWWA ACE58090

AWWA ACE58090

Minimizing Energy Consumption through Valve Selection..

$12.00 $24.00

AWWA WQTC58936

AWWA WQTC58936

Optimization Beyond Turbidity - Fine-Tuning the Disinfection Process and Control of Byproduct Format..

$12.00 $24.00

AWWA JAW30408

AWWA JAW30408

Journal AWWA - The Effect of Soils on the Permeation of Plastic Pipes by Organic Chemicals..

$15.00 $30.00

AWWA ACE99368

AWWA ACE99368

Chlorine Dioxide: An Attractive Alternative for Algae Control in Open, Finished-Water Reservoirs..

$12.00 $24.00