• AWWA JOINT53381
Provide PDF Format

Learn More

AWWA JOINT53381

  • Non-Price Considerations in Selecting a Contract Operator
  • Conference Proceeding by American Water Works Association, 01/01/2001
  • Publisher: AWWA

$12.00$24.00


The desire to save money is the primary motivation for most municipalitieselecting to utilize contract operations; capturing all available efficienciesin operations is certainly an appropriate objective. An obvious challenge inturning to contract operations to save money is that the objective is sometimesmore easily sold than achieved, but other questions deserve equal attention. Thispaper explores some of the non-price factors that are important in the selectionof a contract operator for a municipally-owned water or wastewater system. Thepaper summarizes the recent evaluation process applied by the City of Key West,Florida, in selecting a contract operator for the City's wastewater system.

Related Products

AWWA ACE70633

AWWA ACE70633

Testing Long Term Changes for Compliance with Lead and Copper Rule Revisions..

$12.00 $24.00

AWWA JAW61916

AWWA JAW61916

Journal AWWA - Ten Primary Trends and Their Implications for Water Utilities..

$15.00 $30.00

AWWA C111/A21.11-12

AWWA C111/A21.11-12

Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings..

$41.00 $81.00

AWWA JAW34938

AWWA JAW34938

Journal AWWA - Survey Says Water Utility Advisory Councils Are a Success..

$15.00 $30.00