• AWWA JTMGT69633
Provide PDF Format

Learn More

AWWA JTMGT69633

  • Resolving Treatment Plant Operator Work Scheduling Issues through a Labor/Management Process
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the Hyperion Treatment Plant. Work schedule issues included:too many vacancies;recruitment problem due to shortage of certified operatorsnationwide;too many weekdays off rather than the preferred weekend off; and,"over-utilization" of relief operators to cover vacancies. The labor management process is outlined, along with Hyperion Operations Scheduling Alternative Study (HOSAS) discussions, and the advantages of the new scheduleversus the old schedule. Success of the HOSAS (Hyperion OperationsScheduling Alternative Study) Team included the following:identifying the main problem at theoutset;solution structures have clear objectives;members of management and labor have thekey players; actual data was used in the discussion;all members of the team were willing to meethalfway to achieve a common goal withdeveloped trust and honesty. Includes tables.

Related Products

AWWA 51840

AWWA 51840

10 Years of UK Water Privatisation: A Stakeholder Review..

$12.00 $24.00

AWWA WQTC71365

AWWA WQTC71365

Ceramic Membrane Testing with Ozone in Singapore..

$12.00 $24.00

AWWA WQTC69492

AWWA WQTC69492

Ozone Oxidation of Pharmaceuticals, Pesticides and Endocrine Disruptors during Drinking Water Treatm..

$12.00 $24.00

AWWA DSS71297

AWWA DSS71297

Hydromon™: The First Built-In On-Line Quality Monitoring System in a Public Supply Network..

$12.00 $24.00