• AWWA JTMGT69639
Provide PDF Format

Learn More

AWWA JTMGT69639

  • Embrace Change, Not Change Orders: An Owner's Perspective on Getting Projects Done
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


East Bay Municipal Utility District (EBMUD) contracts for up to $200 million per year in construction work. As a publicutility, EBMUD is generally required by law to select the contractor for each project thatsubmits the lowest-price responsive bid.Disputes between owner and contractor may be inevitable, but both owners andcontractors benefit tremendously by reducing the number and magnitude of disputes, andby resolving them quickly and fairly when they occur.This paper discusses several tools that EBMUD has developed over the years that are responsive to this need, and include the following:third-party review of bid documents; detailed bidder qualifications; multi-phaseinvolvement of project staff; and, partnering.

Related Products

AWWA ACE65313

AWWA ACE65313

Assessing In-situ Regenerable Filter Media for Enhancing NOM Removals..

$12.00 $24.00

AWWA 20392

AWWA 20392

Annual Conference and Exposition 2000 Proceedings..

$29.00 $57.00

AWWA C907-91

AWWA C907-91

Polyvinyl Chloride (PVC) Pressure Fittings for Water-4IN. through 8 In. (100 mm through 200 mm)..

$26.00 $52.00

AWWA JAW6637

AWWA JAW6637

Journal AWWA - Advanced Water Treatment for Color and Organics Removal ..

$15.00 $30.00