• AWWA MTC57575
Provide PDF Format

Learn More

AWWA MTC57575

  • Membrane Procurement Case Study: South Blount County
  • Conference Proceeding by American Water Works Association, 03/05/2003
  • Publisher: AWWA

$12.00$24.00


The design of a new 8-million-gallon-per-day (MGD) water treatment plant for South BlountCounty Utility District (SBCUD) utilized microfiltration (MF)/ultrafiltration (UF) membranes.Several manufacturers can provide MF/UF membrane systems. However, all of these systems areconfigured and operate differently. Once a membrane system is selected, future replacement ofmembrane modules will be limited to the one manufacturer. The configuration of thesemembrane systems also would require different building footprints to house them. Therefore, aRequest for Proposals was prepared to select a system around which to design. The selectionprocess included a ranking of proposals based on both economic and non-economic criteria.Negotiations were then made with the highest ranked manufacturer to determine the final cost,scope of supply, schedule of delivery, and future replacement guarantees. This approach allowedSBCUD to procure a membrane system for a competitive cost and select a system that best mettheir needs while providing guarantees for future membrane replacement costs. Design costswere minimized since the membrane system was selected prior to design. Includes tables, figures.

Related Products

AWWA WQTC69450

AWWA WQTC69450

Indirect Economic Impacts in Water Supplies Augmented with Desalinated Water..

$12.00 $24.00

AWWA ACE65612

AWWA ACE65612

Membrane Product-Specific Testing under LT2 and ETV Protocol..

$12.00 $24.00

AWWA WQTC71462

AWWA WQTC71462

Comparison of Haloacetic Acids Methods USEPA 557 IC-MS/MS and USEPA 552 GC-ECD from Three Drinking W..

$12.00 $24.00

AWWA WQTC69476

AWWA WQTC69476

Pathogen Transport in Porous Media: The Role of Experimental Design, Ionic Strength, and NOM..

$12.00 $24.00