Provide PDF Format
AWWA MTC57643
- Requirements for Flocculation Followed by Ultrafiltration for Direct Treatment of Reservoir Water
- Conference Proceeding by American Water Works Association, 03/05/2003
- Publisher: AWWA
$12.00$24.00
The Wasserwerk des Kreises Aachen in Roetgen, Germany operates with financial help of theGerman Ministry for Education and Research and with scientific support of the IWW(Muelheim/Germany) a large scale membrane pilot plant. This pilot is equipped with twelve 6 mlong pressure vessels resulting in a membrane area of about 1620 m2 to produce about 150 m3/hof filtrate. The pilot plant is operated with flocculated reservoir water as feed. The results show thatthe residence time between dosing and ultrafiltration plant is important. To further investigate therequirements for flocculation a pipe flocculation was constructed and the length of the pipesystems was varied. Includes figures.