• AWWA MTC61084
Provide PDF Format

Learn More

AWWA MTC61084

  • I'll Take a Double Order of Membranes, Extra Value, Hold the Problems Please: Lessons Learned in Membrane Procurement
  • Conference Proceeding by American Water Works Association, 03/01/2005
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlined information on the procurementprocess of Western Canyon RegionalWater Supply Project in Canyon Lake, Texas. Topics covered include: proprietary elements ofmembrane systems; Western Canyonbackground and WTP schematic; procurement alternatives; pilot testing alternatives; maintaining consistency duringnon-continuous testing; first and second 30-day test results offlux, TMP, and temperature; and, be prepared for confirmationtest failure.

Related Products

AWWA JAW30336

AWWA JAW30336

Journal AWWA - Galvanic Stimulation of Corrosion on Lead-Tin Solder-Sweated Joints..

$15.00 $30.00

AWWA ACE99399

AWWA ACE99399

The Greenville DAF WTP Experience: From Initial Process Selection Through Construction..

$12.00 $24.00

AWWA JAW41462

AWWA JAW41462

Journal AWWA - Toxicity of Chlorine Dioxide to Adult Zebra Mussels..

$15.00 $30.00

AWWA WQTC56933

AWWA WQTC56933

Predicting Future Source Water Vulnerability Conditions..

$12.00 $24.00