• AWWA MTC61099
Provide PDF Format

Learn More

AWWA MTC61099

  • Challenges and Solutions in Contracting for the Successful Installation of Low Pressure Membrane Systems
  • Conference Proceeding by American Water Works Association, 03/01/2005
  • Publisher: AWWA

$12.00$24.00


Successful implementation of low pressure membrane systems using multiple contracts requiresconsideration of the unique complexities of the technology and the contracting method to addressthese concerns and to limit potential conflicts and pitfalls. This paper reviews the following fourcritical areas of concern that need to be thoughtfully addressed in contracting for successfulimplementation of low pressure membrane systems:identification of scope of supply and contractor interface limits; requirements for component delivery and transfer;commissioning and troubleshooting activities; and,provisions in the case of defective equipment or work.These critical areas of concern are discussed using experiences from the implementation of a60 million-gallon-per-day (MGD) submerged membrane treatment system for the Racine WaterUtility located with Racine, Wisconsin. Includes table.

Related Products

AWWA DSS60330

AWWA DSS60330

Developing Nashville's Master Water Plan..

$12.00 $24.00

AWWA CONS51061

AWWA CONS51061

Rates, Water Budgets and Outdoor Water Use..

$12.00 $24.00

AWWA ACE99537

AWWA ACE99537

Leveraging Optimization Success Throughout a Utility..

$12.00 $24.00

AWWA ACE95175

AWWA ACE95175

FIELD LOK Gaskets, An Effective Ductile Iron Pressure Pipe Joint Restraining System..

$12.00 $24.00