• AWWA MTC61101
Provide PDF Format

Learn More

AWWA MTC61101

  • Piloting, Design, and Construction of the City of Chesapeake's New 8-MGD Lake Gaston WTP
  • Conference Proceeding by American Water Works Association, 03/01/2005
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines information on a new 8-MGD Lake Gaston water treatment plant (WTP) by the City of Chesapeake, Virginia. Topics covered include: project and City objectives; background of the city of Chesapeake water system; treatment alternatives; raw water quality; pilot testing; membrane pilot testing; pilot plant schematic; pilot testing overview; pilot test program and results; treatment process selection; full-scale design; other design considerations; and, WTP construction. Includes table, figures.

Related Products

AWWA SOURCES66493

AWWA SOURCES66493

Standardizing Gallons per Capita per Day Calculations in New Mexico..

$12.00 $24.00

AWWA WQTC52956

AWWA WQTC52956

Operation of a Laboratory Performance Evaluation Program for Giardia and Cryptosporidium in Water..

$12.00 $24.00

AWWA DSS92023

AWWA DSS92023

Chemical Containment Strategies at Water Filtration Plants..

$12.00 $24.00

AWWA JAW61906

AWWA JAW61906

Journal AWWA - Water Beat -- NDWAC Report Describes Infrastructure Security Road Map..

$15.00 $30.00