• AWWA MTC61106
Provide PDF Format

Learn More

AWWA MTC61106

  • Considerations for Expanding a Conventional Water Treatment Plant with Low Pressure Membranes
  • Conference Proceeding by American Water Works Association, 03/01/2005
  • Publisher: AWWA

$12.00$24.00


This paper outlines the steps of the decision making process associatedwith adding membranes during a future plant expansion. The initial steps includefeasibility assessments to determine any site-specific or water quality challenges that mayeliminate membranes from further consideration. Next, preliminary design can revealsite layout alternatives, pretreatment process requirements, and budget-level costs forcomparison to conventional treatment. If there are uncertainties with the treatmentprocess, pilot testing can be performed. Finally, a thorough evaluation of all significantsite and expansion issues (e.g., available space for future expansions, risk for futureregulatory compliance, plant hydraulics, etc.) can be made prior to embarking on designof membranes for expansion.The experiences of the Modesto Irrigation District (MID) are highlighted as an exampleof how to navigate this decision-making process. With an expansion from 36 to 72 mgd,membranes seemed a viable alternative to the existing conventional water treatment plant(WTP) train at MID. Includes figure.

Related Products

AWWA SOURCES66493

AWWA SOURCES66493

Standardizing Gallons per Capita per Day Calculations in New Mexico..

$12.00 $24.00

AWWA WQTC52956

AWWA WQTC52956

Operation of a Laboratory Performance Evaluation Program for Giardia and Cryptosporidium in Water..

$12.00 $24.00

AWWA DSS92023

AWWA DSS92023

Chemical Containment Strategies at Water Filtration Plants..

$12.00 $24.00

AWWA JAW61906

AWWA JAW61906

Journal AWWA - Water Beat -- NDWAC Report Describes Infrastructure Security Road Map..

$15.00 $30.00