• AWWA MTC64575
Provide PDF Format

Learn More

AWWA MTC64575

  • The Tale of Three Utilities in Obtaining Low-Pressure Reverse Osmosis Facilities: Alternative Project Delivery
  • Conference Proceeding by American Water Works Association, 03/01/2007
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines a comparison of three utilities in Florida in their project delivery methods for obtaining a low-pressure reverse osmosis facility. The utilities included: City of Ormond Beach, City of St. Augustine, and St. Johns County. Presentation topics include: description of projects by utility;descriptions of project delivery methods;perceived advantages of project delivery method; and,perceived disadvantages of project delivery method. Conclusions were that:any project delivery method will work well ifparticipants are willing; Construction-Manager-at-Risk(CMAR) and Engineer-Procurement-Construction Management (EPCM) allow great control of costsand schedules;EPCM provides the most integrated team;CMAR can have conflict with designer if lessthat complete Plans/Specs are used for GMP; and,for "conservative owners", traditionaldesign-bid-build is the safest option.

Related Products

AWWA ACE61747

AWWA ACE61747

Willingness to Pay Surveys: Their Role in Design..

$12.00 $24.00

AWWA JAW61320

AWWA JAW61320

Journal AWWA - How Healthy Are Your Utility's Financial Fundamentals?..

$15.00 $30.00

AWWA JAW39549

AWWA JAW39549

Journal AWWA - An Update of the Federal Regs..

$15.00 $30.00

AWWA WQTC64091

AWWA WQTC64091

Evaluating Potential Genotoxicity of Disinfected Drinking Water..

$12.00 $24.00