• AWWA MTC64575
Provide PDF Format

Learn More

AWWA MTC64575

  • The Tale of Three Utilities in Obtaining Low-Pressure Reverse Osmosis Facilities: Alternative Project Delivery
  • Conference Proceeding by American Water Works Association, 03/01/2007
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines a comparison of three utilities in Florida in their project delivery methods for obtaining a low-pressure reverse osmosis facility. The utilities included: City of Ormond Beach, City of St. Augustine, and St. Johns County. Presentation topics include: description of projects by utility;descriptions of project delivery methods;perceived advantages of project delivery method; and,perceived disadvantages of project delivery method. Conclusions were that:any project delivery method will work well ifparticipants are willing; Construction-Manager-at-Risk(CMAR) and Engineer-Procurement-Construction Management (EPCM) allow great control of costsand schedules;EPCM provides the most integrated team;CMAR can have conflict with designer if lessthat complete Plans/Specs are used for GMP; and,for "conservative owners", traditionaldesign-bid-build is the safest option.

Related Products

AWWA ACE65561

AWWA ACE65561

New Methods to Assess Groundwater Under Direct Influence and Bank Filtration Performance..

$12.00 $24.00

AWWA WQTC57017

AWWA WQTC57017

Evaluation of Magnetic Ion Exchange Resin Treatment for Preferential Removal of NOM Fractions..

$12.00 $24.00

AWWA ACE56163

AWWA ACE56163

Implementing Advanced Early Warning Systems to Safe Guard Public Drinking Water..

$12.00 $24.00

AWWA CSC94021

AWWA CSC94021

SCADA Using 800 MHz Trunked Radio..

$12.00 $24.00