• AWWA MTC69794
Provide PDF Format

Learn More

AWWA MTC69794

  • Distributing the Risk: Meeting Potable Water Supply in Tarpon Springs through Alternative Project Delivery
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing the premise of the presentation, which includes the following considerations: all projects involving a variable raw waterquality have "risk";do alternate delivery projects have even morerisk from variable raw water supplies;who sets raw water quality;what time period to be considered;how many parameters; and,what are the remedies for raw water quality-basednon-performance? A case study of Tarpon Springs, Florida, is presented and covers the following topics:historically dependent upon regional supplier;desires water supply independence - 6.4 mgdfinished water production;very limited freshwater;available brackish aquifers subject to saltwater intrusion from tidally influencedAncloate River and lower aquifer connatewater; and,extensive groundwater modeling to assessminimum groundwater level impacts. Includes tables.

Related Products

AWWA 51840

AWWA 51840

10 Years of UK Water Privatisation: A Stakeholder Review..

$12.00 $24.00

AWWA WQTC71365

AWWA WQTC71365

Ceramic Membrane Testing with Ozone in Singapore..

$12.00 $24.00

AWWA WQTC69492

AWWA WQTC69492

Ozone Oxidation of Pharmaceuticals, Pesticides and Endocrine Disruptors during Drinking Water Treatm..

$12.00 $24.00

AWWA DSS71297

AWWA DSS71297

Hydromon™: The First Built-In On-Line Quality Monitoring System in a Public Supply Network..

$12.00 $24.00