• AWWA MTC93032
Provide PDF Format

Learn More

AWWA MTC93032

  • Membrane Softening Meets the Needs of the City of Fort Myers
  • Conference Proceeding by American Water Works Association, 01/01/1993
  • Publisher: AWWA

$12.00$24.00


This case history provides an overview of how membrane technology was used as a principal component of the City of Fort Myers, Florida, long-range plan to meet potable water needs. Membrane technology has been applied to treat a combined surface water and groundwater source. The new membrane plant can produce 12 mgd of softened potable water and was specifically designed to meet THM water quality limits. Membrane technology was chosen as a process that offered the greatest flexibility for meeting future regulatory limitations. The paper reviews: planning, treatment process evaluation, and pilot testing; design and layout of facilities; lessons learned during construction; and key processes, performance, and operations.

Related Products

AWWA CSC91010

AWWA CSC91010

System Integration From State of Confusion to State of the Art..

$12.00 $24.00

AWWA JAW10327

AWWA JAW10327

Journal AWWA - Public Water Systems and Superfund: Recovering Losses Caused by Contamination ..

$15.00 $30.00

AWWA MTC57653

AWWA MTC57653

A New 10 MGD Membrane Filtration Plant for Eastern Municipal Water District..

$12.00 $24.00

AWWA JAW17237

AWWA JAW17237

Journal AWWA - Removing Giardia Cysts With Slow Sand Filtration ..

$15.00 $30.00