• AWWA QTC98274
Provide PDF Format

Learn More

AWWA QTC98274

  • Maintenance of Free Chlorine and Chloramine Residual in EBMUD Distribution System Pipelines and Storage Reservoirs
  • Conference Proceeding by American Water Works Association, 01/01/1998
  • Publisher: AWWA

$12.00$24.00


The East Bay Municipal Utility District (EBMUD) has converted its distribution system secondary disinfectant from free chlorine to chloramine in early 1998. An extensive water quality monitoring program was implemented in the distribution system pipelines and storage reservoirs to evaluate maintenance of free chlorine and chloramine. Laboratory test results on the stability of chloramine were compared with the distribution system results. Initial nitrification control strategies have been evaluated and operational goals for total chlorine residual and detention time established.

Related Products

AWWA CSC92093

AWWA CSC92093

M.I.S. -- Life After the Consultant..

$12.00 $24.00

AWWA WQTC52840

AWWA WQTC52840

Laboratory Accreditation Under NELAP---Are You Ready..

$12.00 $24.00

AWWA ACE90068

AWWA ACE90068

Performance and Analysis of Tracer Tests to Determine Compliance With the Surface Water Treatment R..

$12.00 $24.00

AWWA 51480

AWWA 51480

A Teleworking Success Story or If I Could Be an Animal, I Would Be a Turtle..

$12.00 $24.00