• AWWA RSP64391
Provide PDF Format

Learn More

AWWA RSP64391

  • A Risk-Managed Approach to Averting PCCP Failure
  • Conference Proceeding by American Water Works Association, 03/01/2007
  • Publisher: AWWA

$12.00$24.00


This slide presentation begins with an outline of the City of Phoenix, Arizona's Large Water Main Assessment Program. It outlines the city of Phoenix's risk-managed approach to averting pre-stressed concrete cylinder pipe (PCCP) and covers topics that include: pipeline prioritization; elements of a risk assessment; likelihood factors ofinstallation date, waterway proximity and soil corrosivity; consequence factors ofpipeline diameter, adjacent land use, and proximity to railways and roadways; geographic information system (GIS)-Based Analysis; hydraulic modeling; Phoenix water model; demand, production, and evaluation of system impacts; and, PCCP Assessment Master Plan. Includes figures.

Related Products

AWWA WQTC60611

AWWA WQTC60611

Comparison of an Anionic Polymer to No Polymer Addition for Treating Filter Backwash Water..

$12.00 $24.00

AWWA MTC64524

AWWA MTC64524

Integrated Approach to Construction and Startup of the 96 mgd Lakeview WTP for the Region of Peel..

$12.00 $24.00

AWWA INF52174

AWWA INF52174

Field Performance Monitoring of a Sliplined Watermain..

$12.00 $24.00

AWWA ACE59836

AWWA ACE59836

Water Conservation in Georgia Bringing Efficiency into Mainstream Thinking..

$12.00 $24.00