Provide PDF Format
AWWA SOURCES66544
- Bringing a Regional Surface Water Supply Project from Concept to Reality
- Conference Proceeding by American Water Works Association, 02/01/2008
- Publisher: AWWA
$12.00$24.00
This powerpoint presentation presents a project thatdelivered treated Tuolumne River surfacewater (TID water rights),TID responsible for constructing andoperating the project thatwholesaled water to the California cities ofTurlock, Modesto, Hughson, and Ceres.Project drivers included groundwater quality anddrinking water standards, and project history is outlined. Current efforts include: Turlock approved first Drinking WaterAgreement in Oct. 2005, followed byCeres, Hughson, and Modesto; and,Design-Build contract includedwater treatment plants and pipelines. Requested flow rates, project operations, key components of regional water system, TID - infiltration gallery, raw water system, water treatment plant, pilot plant process design, finished water storage andpump station, water transmission, pipeline alignment, and city interconnections are all presented.
Related Products
AWWA DSS60350
Design, Construction and Operation of Denver's New Recycled Water System..
$12.00 $24.00
AWWA JAW64847
Journal AWWA - Process-Train Profiles of NOM through a Drinking Water Treatment Plant..
$15.00 $30.00
AWWA JAW59515
Journal AWWA - Expanded Summary: Protecting Watersheds from Cryptosporidium in Manure: A Literature ..
$15.00 $30.00