• AWWA SOURCES66544
Provide PDF Format

Learn More

AWWA SOURCES66544

  • Bringing a Regional Surface Water Supply Project from Concept to Reality
  • Conference Proceeding by American Water Works Association, 02/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation presents a project thatdelivered treated Tuolumne River surfacewater (TID water rights),TID responsible for constructing andoperating the project thatwholesaled water to the California cities ofTurlock, Modesto, Hughson, and Ceres.Project drivers included groundwater quality anddrinking water standards, and project history is outlined. Current efforts include: Turlock approved first Drinking WaterAgreement in Oct. 2005, followed byCeres, Hughson, and Modesto; and,Design-Build contract includedwater treatment plants and pipelines. Requested flow rates, project operations, key components of regional water system, TID - infiltration gallery, raw water system, water treatment plant, pilot plant process design, finished water storage andpump station, water transmission, pipeline alignment, and city interconnections are all presented.

Related Products

AWWA WQTC65833

AWWA WQTC65833

Installation of a High Rate Magnetic Ion Exchange Process to Bring a Groundwater System into Complia..

$12.00 $24.00

AWWA ACE68745

AWWA ACE68745

Transient Analysis of Sudden Pump Shutdown: Experience Gained from the Coyote Springs Project..

$12.00 $24.00

AWWA IMTECH59635

AWWA IMTECH59635

Plant Automation Using Fieldbus Technology in the Water Industry..

$12.00 $24.00

AWWA ACE93178

AWWA ACE93178

Fusion Bonded Epoxy for Flow Efficiency and Corrosion Protection of Steel and Ductile Iron Pipe..

$12.00 $24.00