• AWWA WQTC60657
Provide PDF Format

Learn More

AWWA WQTC60657

  • Pre-Oxidation with Chlorine Dioxide to Control Bromate Formation During Subsequent Ozonation
  • Conference Proceeding by American Water Works Association, 11/15/2004
  • Publisher: AWWA

$12.00$24.00


Research was conducted at Metropolitan (at a demonstration-scale plant) on the effects ofchlorine dioxide (or its byproduct chlorite) on bromate and chlorate formation and disinfection(CT) credit during subsequent ozonation. Pre-oxidation with 0.5 or 1.0 mg/L chlorine dioxidejust prior to ozone addition resulted in reduced bromate formation and increased Giardiainactivation credit from ozone. The addition of chlorite only (0.7 mg/L) reduced bromateformation and disinfection credit. The results suggest that the presence of chlorite reacts rapidlywith ozone, reducing the amount of ozone available for either bromate formation or disinfectioncredit. Alternatively, the addition of chlorine dioxide in these tests appeared to satisfy more ofthe oxidant demand than that exerted by the chlorite produced, resulting in a net benefit inbromate control and increased disinfection. In these tests, chlorite was oxidized to chlorate,which needs to be considered if chlorate is regulated in the future (currently there is an actionlevel of 0.8 mg/L for chlorate in California).In additional tests, low-pH ozonation (6.5) reduced bromate formation below its maximumcontaminant level of 10 µg/L. Combinations of chlorine dioxide pre-oxidation and low-pHozonation further reduced bromate formation. This paper discusses the relative merits of eachapproach for controlling bromate formation and meeting disinfection goals. Includes 13 references, figures.

Related Products

AWWA ACE56167

AWWA ACE56167

Hydraulic Considerations for Filter High-Rating..

$12.00 $24.00

AWWA QTC97043

AWWA QTC97043

Advances in REOS Reservoir Monitoring Technology..

$12.00 $24.00

AWWA C907-12

AWWA C907-12

Polyvinyl Chloride (PVC) Pressure Fittings for Water-4 in. through 12 In. (100 mm through 300 mm) fo..

$41.00 $81.00

AWWA EDC52021

AWWA EDC52021

Building and Managing an Effective Construction Project Web Site..

$12.00 $24.00