• AWWA WQTC60662
Provide PDF Format

Learn More

AWWA WQTC60662

  • Corrosion Control Optimization Using Lead Pipe Loops
  • Conference Proceeding by American Water Works Association, 11/15/2004
  • Publisher: AWWA

$12.00$24.00


In an effort to further optimize their corrosion control strategy, a Lake Michigan water utilitytested several phosphate inhibitors for their effectiveness to control lead. The objective of thisresearch was to show through pipe loop testing, the impact of different forms and dosages ofphosphate-based corrosion inhibitors on lead levels. Furthermore, this study investigated theimpact of seasonal temperature variations on lead levels and the role of deposition formation incorrosion control.Testing was completed using multiple pipe loop systems. Each loop was constructed of two 15-foot legs of 1-inch lead service line gathered from the utility's distribution system. Water flowedthrough the loops at 2 feet per second (ft/s) for 16 hours and then stagnated for 8 hours. Sampleswere collected after approximately 7 hours of stagnation. Several conditions were tested over athree year period. Overall results from the testing showed the following:orthophosphate was more effective than polyphosphate for controlling lead levels;orthophosphate alone was as effective as blended phosphate in controlling lead levels;lead levels were moderately impacted by temperature and increased at highertemperatures;short-term variations in phosphate feed did not seem to impact lead levels;phosphate application may result in the formation of a deposit as it combines with watertreatment chemicals, such as aluminum; and,lead levels and phosphate doses can be optimized to meet multiple objectives. Includes tables, figures.

Related Products

AWWA ACE56167

AWWA ACE56167

Hydraulic Considerations for Filter High-Rating..

$12.00 $24.00

AWWA QTC97043

AWWA QTC97043

Advances in REOS Reservoir Monitoring Technology..

$12.00 $24.00

AWWA C907-12

AWWA C907-12

Polyvinyl Chloride (PVC) Pressure Fittings for Water-4 in. through 12 In. (100 mm through 300 mm) fo..

$41.00 $81.00

AWWA EDC52021

AWWA EDC52021

Building and Managing an Effective Construction Project Web Site..

$12.00 $24.00