• AWWA WQTC62372
Provide PDF Format

Learn More

AWWA WQTC62372

  • D.C. Exceedance of Lead Action Level: Planning, Implementation and Results of Washington Aqueduct's Pipe Loop Study
  • Conference Proceeding by American Water Works Association, 11/01/2005
  • Publisher: AWWA

$12.00$24.00


This paper discusses the planning, implementation and results of Washington Aqueduct's Pipe Loop Study that is designed to complement the ongoing lead research work being performed by the District of Columbia Water and Sewer Authority (WASA), the US Environmental Protection Agency (USEPA), and associated members of the Technical Expert Working Group. The primary purpose of the proposed flow-through, lead pipe loop testing is to evaluate theeffectiveness of alternate corrosion control strategies on reducing lead concentrations in Districtof Columbia drinking water. Secondarily, the results obtained during the testing period will bedisseminated to the water industry at large as a good will offering. Based on the results andrecommendations of Washington Aqueduct's 2004 Desktop Evaluation, a comparison of theeffectiveness of two alternate corrosion inhibitors (phosphoric acid and zinc orthophosphate) will beconducted. Filtered and finished water produced at Washington Aqueduct's Dalecarlia treatment plant isused as source water for the testing. Additional treatment chemicals are added to the filteredwater flow stream to "simulate" finished water quality under a variety of conditions. Samples of lead service lines excavated from the Washington D.C. water distribution systemwere used to construct the pipe loops to ensure that the test results replicate actual full-scaleconditions to the greatest degree possible. Includes 2 references.

Related Products

AWWA WQTC71558

AWWA WQTC71558

Removal of Typical Perfluorinated Surfactants from Water Using Some Conventional Adsorbents..

$12.00 $24.00

AWWA DSS90031

AWWA DSS90031

Safe and Sanitary Procedures for Underwater Inspection of Your Reservoirs..

$12.00 $24.00

AWWA ACE70487

AWWA ACE70487

New Tools for Sustainable Energy Management Decisions..

$12.00 $24.00

AWWA ACE54315

AWWA ACE54315

Modeling Tools to Predict National Compliance Forecasts and DBP Exposure..

$12.00 $24.00