• AWWA WQTC62410
Provide PDF Format

Learn More

AWWA WQTC62410

  • Being Prepared for High Profile Events
  • Conference Proceeding by American Water Works Association, 11/01/2005
  • Publisher: AWWA

$12.00$24.00


Since September 11, 2001 the awareness for the need to solidify the security ofthe nation's infrastructure has been heightened. This infrastructure included the protection ofdrinking water sources from contamination and terrorist threats. Washington, DC's water supplyand distribution system, like much of the infrastructure in the city, was considered a highpriority of protection and the water authority has received a vast amount of equipmentand training to assist in this program.This paper discusses some of the District of Columbia's water security andemergency management structure, as well as the Authority's preparation and operationsprior to and during high profile events. Topics covered include: Regional Incident Communication and Coordination System (RICCS); water quality monitoring; District of Columbia Water and Sewer Authority (DCWASA) Routine Operations; and, DCWASA's role in the 2005 presidential inauguration.

Related Products

AWWA ACE70633

AWWA ACE70633

Testing Long Term Changes for Compliance with Lead and Copper Rule Revisions..

$12.00 $24.00

AWWA JAW61916

AWWA JAW61916

Journal AWWA - Ten Primary Trends and Their Implications for Water Utilities..

$15.00 $30.00

AWWA C111/A21.11-12

AWWA C111/A21.11-12

Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings..

$41.00 $81.00

AWWA JAW34938

AWWA JAW34938

Journal AWWA - Survey Says Water Utility Advisory Councils Are a Success..

$15.00 $30.00