• AWWA WQTC64146
Provide PDF Format

Learn More

AWWA WQTC64146

  • Factors Effecting Direct and Indirect Membrane Integrity Testing, a Look at Pilot and Full Scale Results from Three Different Membrane Manufacturers
  • Conference Proceeding by American Water Works Association, 11/01/2006
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines factors effecting direct and indirect membrane integrity testing and pilot and full scale results from three different membrane manufacturers. Topics covered include: definition of Log Removal Value (LRV) and Pressure DecayTest;regulations on Membrane IntegrityTesting;Piloting Results;Full Scale Performance;How to Scale UpPilot Results to Full Scale; and, Design Criteria that Effect LRV. Conclusions indicated that: log credit awarded only as good as what canbe tested and measured;pilot scale results can be used to verifyeffectiveness of integrity test;ability to detect a single fiber breach duringpiloting is useful information but cannot bescaled up just linearly for full scale; the Engineer/Owner should considerLRVwhen defining design criteria andthroughout the design process to ensureoptimized design; feed concentration, start pressure andtest duration effect LRV<sub>DIT</sub>; specify direct integrity test method type; specify the required removal credit asLRV<sub>DIT</sub> at a given test pressure; and, with differences between membranemanufacturers, all the more reason tohave a competitive bid. Includes tables, figures.

Related Products

AWWA ACE54487

AWWA ACE54487

Improving Inlet Hydraulics for Process Flow Distribution and Control..

$12.00 $24.00

AWWA ACE94272

AWWA ACE94272

Distribution Flushing Program: The Benefits and Results..

$12.00 $24.00

AWWA ACE61717

AWWA ACE61717

UV and UV/H2O2 Degradation and Subsequent Estrogenic Activity of EDCs in Water..

$12.00 $24.00

AWWA SOURCES66599

AWWA SOURCES66599

The Final Solution: Budget-Based Rates for Landscape Irrigation..

$12.00 $24.00