• AWWA WQTC69240
Provide PDF Format

Learn More

AWWA WQTC69240

  • Preparing for the Expected: Developing a Scenario Planning Matrix and Operational Strategy for Challenging Operational Conditions
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation presents a case study at the Union Hills Water Treatment Plant (UHWTP) on turbidity mitigation issues and strategies. A scenario planning matrix is provided, along with implementation of predictive technology, Turbidity Event Operating StrategiesGuide (TEOSG). TEOSG Event Preparation, Chemical DosingStrategy, Liquid Process OperationalStrategy, Solids Handling ProcessOperations, and Close Out and Documentation are all outlined. Includes tables, figure.

Related Products

AWWA JAW30420

AWWA JAW30420

Journal AWWA - Pilot Study on Treatment of Surface Water for Groundwater Injection..

$15.00 $30.00

AWWA ACE95150

AWWA ACE95150

The Benefits of Using a Standard Methodology for Designing SCADA Systems in a Major Water Company..

$12.00 $24.00

AWWA JTMGT64460

AWWA JTMGT64460

Water and Wastewater Specific RAMCAP Guidance..

$12.00 $24.00

AWWA JAW39550

AWWA JAW39550

Journal AWWA - Developing the Ground Water Disinfection Rule..

$15.00 $30.00