• AWWA WQTC69243
Provide PDF Format

Learn More

AWWA WQTC69243

  • Hydraulic Improvement of the High-Rate Sand Ballasted Clarifier: The Turbomix Technology
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This paper presents the results from the first U.S. pilot study of the ACTIFLO® Turbotechnology. The pilot was conducted with the assistance of the Town of Louisburg, North Carolina fromMay through August 2008. The ACTIFLO® Turbo pilot unit consists of a 200 gpm (756 lpm)capacity ACTIFLO® Turbo tank system, with coagulation, maturation, and settling tanks. Thematuration tank is equipped with a Turbomix stainless steel draft tube and mixer, whichprovides a condensed mixing zone for enhanced flocculation. The inclusion of the Turbomixallows for the following design improvements:reduced retention times, by as much as 50% in the coagulation tank and 50% inthe maturation tank, as opposed to the conventional ACTIFLO® parameters;the elimination of the injection tank and mixer from the design;operation at a settling tank overflow rate of 32 gpm/sq. ft. (80 m/hr) and greater,instead of the typical design rate for conventional ACTIFLO® drinking waterdesigns; and, reduced total system retention time of approximately 7 minutes or less.This technology has been evaluated on a pilot scale at the Louisburg Drinking Water Plantover a period of 8 weeks. The data from the Louisburg trials shows the ACTIFLO®Turbo system's ability to produce effluent water turbidities of < 1 NTU at settling tankoverflow rates of up to 50 gpm/sq. ft. (120 m/hr). Coagulant and polymer feed rates remainedconsistent with prior conventional ACTIFLO® pilots conducted on similar source waters. TheLouisburg pilot demonstrates the ACTIFLO® Turbo system's ability to produce excellentsettled water quality in a greatly reduced footprint. Includes 5 references, tables, figures.

Related Products

AWWA WQTC60611

AWWA WQTC60611

Comparison of an Anionic Polymer to No Polymer Addition for Treating Filter Backwash Water..

$12.00 $24.00

AWWA MTC64524

AWWA MTC64524

Integrated Approach to Construction and Startup of the 96 mgd Lakeview WTP for the Region of Peel..

$12.00 $24.00

AWWA INF52174

AWWA INF52174

Field Performance Monitoring of a Sliplined Watermain..

$12.00 $24.00

AWWA ACE59836

AWWA ACE59836

Water Conservation in Georgia Bringing Efficiency into Mainstream Thinking..

$12.00 $24.00