• AWWA WQTC69271
Provide PDF Format

Learn More

AWWA WQTC69271

  • The Challenge of Upgrading the Pittsburgh Water Treatment Plant Clearwell
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by presentingproject objectives that include the following:meet Pittsburgh Water & Sewer Authority (PWSA) stated goals ofallowing existing clearwell to be taken out ofservice for maintenance, andtransporting water directly to Bruecken PumpStation; continue to supply high quality water during andafter construction; and,meet current and future regulatory requirements. Topics covered include the following: existing clearwell;clearwell improvement alternatives;increased utilization of existing system storage;rehabilitation of existing clearwell; evaluation of alternatives; conclusions and recommendations; and,implementation. Includes table, figures.

Related Products

AWWA WQTC62454

AWWA WQTC62454

Virus and Bacteria Removal During Flow Through Saturated Clay Soil Columns..

$12.00 $24.00

AWWA WSC69993

AWWA WSC69993

Development and Implementation of a Business Continuity Plan..

$12.00 $24.00

AWWA B701-11

AWWA B701-11

Sodium Fluoride..

$36.00 $71.00

AWWA C225-14

AWWA C225-14

Fused Polyolefin Coating Systems for Steel Water Pipe..

$41.00 $81.00