Provide PDF Format
AWWA WQTC69291
- UCMR2 - Lessons Learned in Year One (The Good, the Bad, and the Ugly)
- Conference Proceeding by American Water Works Association, 11/01/2008
- Publisher: AWWA
$12.00$24.00
This powerpoint presentation begins by providing a brief overview of UCMR2 methodology and the laboratory approval process. The issues presented include the following: CDX/SDWARS Issues;Utility Issues;Lab Startup Issues;General Method Issues; and,Electronic Upload Issues. Presentation conclusions indicate the following: UCMR2 is a complex project, with manyopportunities for "issues" but there haven't been asmany as one would have expected; methods are more rugged than originally seenduring development, except 535, practice makesperfect. Includes figures.
Related Products
AWWA C300-97
Reinforced Concrete Pressure Pipe, Steel-Cylinder Type, for Water and Other Liquids..
$23.00 $45.00
AWWA MTC64614
RO Process Design Optimization Based on Stochastic Cost Estimation Model Coupled with Process Perfor..
$12.00 $24.00
AWWA WQTC52875
Low Pressure UV Inactivation of Cryptosporidium parvum and Giardia lamblia Based on Infectivity Assa..
$12.00 $24.00