• AWWA WQTC71356
Provide PDF Format

Learn More

AWWA WQTC71356

  • Key Steps to Follow in Replacing a LIMS (Laboratory Information Management System) in Your Laboratory: A Case Study of a Water Quality Laboratory
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation focuses on the key steps that are required for a successfulLIMS replacement project, including: needs assessment; Request forProposal creation; product demos; selection; purchase anddeployment; and, data migration from the historical LIMS. Theuseful life of a LIMS will depend on how well the LIMS matches therequirements of the laboratory, some LIMS survive less than a yearwhile LIMS that are a "good fit" can manage the laboratory samplesfor 10 or more years. There are also cases in which the LIMS teamwill try to adapt the laboratory operations to the LIMS or customize theLIMS to meet the data management challenges even though thecustomized system may fall short of the complete data managementrequirements.

Related Products

AWWA ACE56256

AWWA ACE56256

SDWA Compliance and Planning Study for a Small Connecticut Surface Water Treatment Plant..

$12.00 $24.00

AWWA INF55787

AWWA INF55787

Project Team Uses Effective Planning, Engineering, and Public Relations Tools for Raw Water Main Rep..

$12.00 $24.00

AWWA WQTC57119

AWWA WQTC57119

Environmental Technology Verification of Low- and Medium-Pressure Ultraviolet Systems..

$12.00 $24.00

AWWA SOURCES59263

AWWA SOURCES59263

The State of Texas Task Force to Evaluate Water Conservation in Texas..

$12.00 $24.00