Provide PDF Format
AWWA WQTC71505
- Optimizing Arsenic Removal Water Treatment Plants to Perform as Efficiently as Pilot Testing
- Conference Proceeding by American Water Works Association, 11/01/2009
- Publisher: AWWA
$12.00$24.00
This powerpoint presentation begins by providing a brief overview of the Isleton and Walnut Grove water systems. The steps taken to comply with the U.S. Environmental Protection Agency's (USEPA's)new arsenic standard (10 µg/L MCL) are listed, along with improvements to Walnut Grove's 300gpm direct filtration plant and to Isleton's 500 gpm direct filtration plant. Project results are provided, along with a comparison of pilot testing and full scale operating conditions at Isleton, a strategy to address performance challenges of the pilot study, arsenic removal optimizationstrategies for walnut grove and for Isleton. Includes table, figure.
Related Products
AWWA ACE61682
Denver Water's System Specific Study for the Stage 2 Disinfectants and Disinfection Byproducts Rule..
$12.00 $24.00
AWWA WQTC50459
Inactivation of Cryptosporidium parvum With Chlorine Dioxide/Free Chlorine and Chlorine Dioxide/Mono..
$12.00 $24.00