• AWWA WQTC71602
Provide PDF Format

Learn More

AWWA WQTC71602

  • Building on 20+ Years of Corrosion Control Optimization with Inhibitor Pre-Qualification in Pinellas County, Florida
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This paper presents a corrosion inhibitor pre-qualification study for the Pinellas County WaterSystem (PCWS). The sheer size and complexity of the County's system, combined with the use of chloramine disinfection, multiple distribution system points of entry, and a variable blend of ground, surface and desalinated sources, makes for a challenging system to monitor and maintain. One of the County's long-standing successes has been its optimized corrosion control program. The success is highlighted by numerous corrosion investigations to resolve corrosion problems that first became apparent through reports of leaking copper pipes in homes and apartment complexes in the early 1970s. Since that time, the County determined that a combination of pH control and proprietary orthopolyphosphate corrosion inhibitor addition is the best available practice for controlling lead and copper release. This methodology has remained effective for their regional blended ground, surface and desalted water supply that is disinfected with chloramine. In light of escalating water treatment chemical costs, the County embarked on a program to prequalify alternate products for competitive bidding. This followed prior formal tests of alternative products to the original product in 1994 and 2003. The subsequent testing and competitive bids lead to contract extensions with the original vendor when products with comparable performance were not found or when the price of competitive products was higher. Includes 3 references, tables, figures.

Related Products

AWWA WQTC58929

AWWA WQTC58929

Monitoring Membrane Integrity Across Four Micro Filtration Pilot Plants Using Multiplexed Light Scat..

$12.00 $24.00

AWWA WQTC62425

AWWA WQTC62425

Evaluation of Existing Models for Predicting DBP Formation Potential of California State Project Wat..

$12.00 $24.00

AWWA ACE93138

AWWA ACE93138

Sequencing Biofilm Reactors for the Treatment of Groundwater Contaminated With Chloroethenes..

$12.00 $24.00

AWWA ACE93152

AWWA ACE93152

Rechloramination in the Distribution System..

$12.00 $24.00