• AWWA WQTC71609
Provide PDF Format

Learn More

AWWA WQTC71609

  • On-Site Validation and Operational Optimization of the Seymour-Capilano UV Disinfection Facility
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


The Seymour-Capilano Filtration Plant is Metro Vancouver's first direct filtration plant and willbe the largest operational ultraviolet light system for the disinfection of drinking water followingstart-up of the facility in late 2009. Over the first six months of 2009, various full-scale tests aswell as pilot-scale and laboratory evaluations were conducted to prepare for on-site biodosimetrytesting, which has presented many unique challenges, since this facility was not designed for UVsystem validation. The data from the UV system validation conducted using the 2003 draft ofthe UV Disinfection Guidance Manual was reevaluated in accordance with the final version ofthe manual to determine the energy savings achieved by updating the control philosophy of thesystem. The potential energy savings associated with additional on-site biodosimetry testing wasalso evaluated using performance models generated from a recent validation of a similar UVvessel with an alternative UV-sensitive challenge microorganism, T1 bacteriophage. Energyconsumption and present worth evaluations were conducted to determine which options had thegreatest potential to minimize the cost and optimize the operating efficiency of the UV system. Includes 2 references, tables, figures.

Related Products

AWWA ACE63104

AWWA ACE63104

Internal Communications: Getting Stronger from the Inside Out..

$12.00 $24.00

AWWA JAW6583

AWWA JAW6583

Journal AWWA - Tracing Well Water Pollution in a Limestone Aquifer ..

$15.00 $30.00

AWWA ACE93129

AWWA ACE93129

Bromate Production in Ozone Contactors..

$12.00 $24.00

AWWA JAW71986

AWWA JAW71986

Journal AWWA - Vulnerability of Drinking Water Supply Wells to VOCs..

$15.00 $30.00