• CTI ESG-121 (09)
Provide PDF Format

Learn More

CTI ESG-121 (09)

  • Construction Safety and Health Guidelines
  • standard by Cooling Technology Institute, 10/01/2009
  • Publisher: CTI

$5.00$10.00


The purpose of this document is to serve as a safetyand health guideline for various cooling towerprocedures that are routinely performed on job sites.The information provided is based on OSHA federalrequirements.

This document serves as a guideline only. Eachcooling tower owner or cooling tower contractor isresponsible for ensuring the safety and health of theemployees on the job sites, not CTI.

Related Products

CTI ATC-140 (94)

CTI ATC-140 (94)

Isokinetic Drift Test Code..

$25.00 $50.00

CTI TP76-08

CTI TP76-08

Complete Reuse of Cooling Tower Blowdown..

$7.00 $14.00

CTI TP85-18

CTI TP85-18

A System Efficient Approach to Cooling Tower Energy Modifications (TP-85-18)..

$7.00 $14.00

CTI TP81-11

CTI TP81-11

Evaluation of Cooling Tower Test Accuracy (TP-235A)..

$7.00 $14.00