• CTI TP97-09
Provide PDF Format

Learn More

CTI TP97-09

  • On-Line Performance Monitoring of the 1300 MW Natural Draft Cooling Towers on American Electric Power's General James M. Gavin Plant
  • standard by Cooling Technology Institute, 02/01/1997
  • Publisher: CTI

$7.00$14.00


Related Products

CTI TP07-08

CTI TP07-08

Corrosion-Induced Concrete Deterioration and Rehabilitation of Natural Draft Hyperbolic Cooling Towe..

$7.00 $14.00

CTI TP04-11

CTI TP04-11

Thorough Inspections Reduce Cooling Tower Mechanical and Performance Risks..

$7.00 $14.00

CTI TP89-06

CTI TP89-06

Polymer/HED Blends for Calcium Carbonate Deposit Control (TP-89-06)..

$7.00 $14.00

CTI TP99-02

CTI TP99-02

Diagonal Bracing Connections in Fiberglass Cooling Towers..

$7.00 $14.00