• DOXPUB 11-0004-SOP
Provide PDF Format

Learn More

DOXPUB 11-0004-SOP

  • Fume Hood Operation and Maintenance
  • standard by Doxpub, Inc., 08/01/2007
  • Publisher: DOXPUB

$20.00$39.00


Summary:

Provides operating instructions for working in the Kewaunee Airflow Supreme Fume Hood, and is easily adaptable for other makes and models. Applies to Kewaunee Airflow Supreme Fume Hoods using in GMP manufacturing facilities. Includes general considerations, instructions for working in the hood, and maintenance of the hood.

Included Sections:

Purpose, Scope, Responsibility, References and Applicable Documents, Materials and Equipment, Health and Safety Considerations, Documentation Requirements, and Procedures

Included Attachments/Appendices:

Fume Hood Monitoring and Maintenance Log

About This Document:

This is not a generic template, it's a 4-page procedure that was actually created and used in the Facilities & Equipment operations of a FDA-regulated establishment. The company-specific information (names, addresses, some images, proprietary product information, etc.) has been redacted but the content and format have been largely preserved.

Reasons to Buy:

  • Use it as a starting point for your own documentation project
  • Compare the quality of your documents against your industry peers
  • Learn what other companies in your industry are actually doing

Who Will Benefit:

  • Manufacturing Personnel
  • Facilities Managers
  • Laboratory Personnel

Related Products

DOXPUB 09-0052-SOP

DOXPUB 09-0052-SOP

FDA Contact Documentation Procedure..

$15.00 $29.00

DOXPUB 09-0053-SOP

DOXPUB 09-0053-SOP

Column Inspection, Salvage and Reconciliation..

$58.00 $115.00

DOXPUB 04-0080-PVP-1.0

DOXPUB 04-0080-PVP-1.0

Qualification of Modifed Co-extruded PE/PVC Tubing, Protocol..

$170.00 $340.00

DOXPUB 09-0035-SOP

DOXPUB 09-0035-SOP

Environmental Monitoring Using Biotest RCS Centrifugal Air Samplers..

$30.00 $59.00