• GANA BECD 01-0314
Provide PDF Format

Learn More

GANA BECD 01-0314

  • The Top 10 Items Commonly Missing from Fenestration System Shop Drawings (Glass Information Builletin)
  • Bulletin / Circular by Glass Association of North America, 03/01/2014
  • Publisher: GANA

$62.00$124.00


Shop drawings, for glass and aluminum windows, curtain walls and skylights, must document and detail all requirements of design parameters, material ordering, fabrication and erection. Failure to properly document these requirements can result in numerous errors and project delays. In order to provide a reminder of key elements of successful shop drawings, members of the GANA Building Envelope Contractors (BEC) Division developed this list of the Top Ten items commonly missing from fenestration systems shop drawings. This document was published in March 2014.

Related Products

GANA MD 05-0212

GANA MD 05-0212

Green Aspects of Mirror (Glass Information Builletin)..

$60.00 $120.00

GANA  Sealant Manual (2008)

GANA Sealant Manual (2008)

Customers Who Bought This Also Bought..

$35.00 $70.00

GANA 01-0116

GANA 01-0116

Proper Procedures for Cleaning Architectural Glass Products (Glass Information Builletin)..

$27.00 $53.00

GANA 04-0612

GANA 04-0612

Suggested Procedures for Dealing with Broken Glass (Glass Information Builletin)..

$41.00 $82.00