Provide PDF Format
NECA 200-2010
- Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI)
- standard by National Electrical Contractors Association, 2010
- Publisher: NECA
$20.00$40.00
Describes installation procedures for temporary power at construction sites. It covers the planning, installation, expansion, maintenance, cutover, and removal of temporary power systems operating at 600 volts or less. NECA 200 is approved as an American National Standard (ANS).
Related Products
NECA 411-2014
Standard for Installing and Maintaining Uninterruptible Power Supplies (UPS)..
$20.00 $40.00
NECA 120-2012
Standard for Installing Armored Cable (Type AC) and Metal-Clad Cable (Type MC)..
$20.00 $40.00