• PIP CVS02100
Provide PDF Format

Learn More

PIP CVS02100

  • Site Preparation, Excavation, and Backfill Specification [Editorial Revision]
  • standard by Process Industry Practices, 05/01/2014
  • Publisher: PIP

$50.00$100.00


This Practice provides the requirements for site preparation, excavation, and backfill. This Practice describes the requirements for excavation, placement, inspection, and management of earthen and organic materials during the site preparation, excavation, and backfill phase of a construction project.

Related Products

PIP PN03SA0B02

PIP PN03SA0B02

Piping Material Specification 3SA0B02 Class 300, Type 304/304L SS, Butt Weld, 0.000" C.A. Proce..

$38.00 $75.00

PIP RESR001

PIP RESR001

Packaged, Skid-Mounted Industrial Process Refrigeration Systems Specification [Editorial Revision]..

$88.00 $175.00

PIP PN03CM1S01

PIP PN03CM1S01

Piping Material Specification 3CM1S01 Class 300, 9 CR - 1 MO, 0.063" C.A. Process [Complete Rev..

$38.00 $75.00

PIP ELSBD01

PIP ELSBD01

Design and Fabrication of Metal-Enclosed Nonsegregated-Phase Bus Duct Assemblies [Complete Revision..

$50.00 $100.00