Provide PDF Format
PIP CVS02100
- Site Preparation, Excavation, and Backfill Specification [Editorial Revision]
- standard by Process Industry Practices, 05/01/2014
- Publisher: PIP
$50.00$100.00
This Practice provides the requirements for site preparation, excavation, and backfill. This Practice describes the requirements for excavation, placement, inspection, and management of earthen and organic materials during the site preparation, excavation, and backfill phase of a construction project.
Related Products
PIP PCDPS001-R-EEDS
Packaged Equipment Instrumentation Documentation Requirements Data Sheet and Instructions Electronic..
$63.00 $125.00
PIP CTCE1000
External Coating System Selection Criteria [Reaffirmation with Editorial Revision]..
$75.00 $150.00
PIP ELSAP04
Uninterruptible Power Supply (UPS) System Specification [Complete Revision]..
$60.00 $120.00