• PIP PNE00003
Provide PDF Format

Learn More

PIP PNE00003

  • Process Unit and Offsites Layout Guide [Complete Revision]
  • standard by Process Industry Practices, 06/01/2013
  • Publisher: PIP

$53.00$105.00


This Practice provides guidance for the design and layout of process units and offsites. This guide should be used as a starting point for the development of plans, electronic models, and working drawings for process units and offsites. This Practice should be coordinated with the overall site and offsites layout for geotechnical, grading, zoning, building codes, life safety code, fire codes, other regulatory requirements, and owner?s and insurer?s risk assessment requirements.

This Practice describes the guidelines for the layout of plot areas, equipment, pipe racks, piping, platforms, roadways, and other miscellaneous items.

Layout includes equipment location, access and egress for personnel safety, access for operations and maintenance, and provisions for operational housekeeping and constructability.

Related Products

PIP VEFV1100

PIP VEFV1100

Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units) [Technical Correction]..

$563.00 $1,125.00

PIP PNSMV015

PIP PNSMV015

Low and Intermediate Alloy Steel Check Valve Descriptions [Complete Revision]..

$50.00 $100.00

PIP STF05530

PIP STF05530

Grating Details..

$113.00 $225.00

PIP RESP003H

PIP RESP003H

Specification for High Power Horizontal Centrifugal Pumps for Water Service [Editorial Revision]..

$90.00 $180.00