• RTCA DO-160D Change 3
Provide PDF Format

Learn More

RTCA DO-160D Change 3

  • Environmental Conditions and Test Procedures for Airborne Equipment
  • Amendment by Radio Technical Commission for Aeronautics, 12/05/2002
  • Publisher: RTCA

$49.00$97.00


Change 3 revises Section 22 - Lightning Induced Transient Susceptibility and Appendix C - Change Coordinators. Section 22 provides two groups of tests for equipment qualification. The first is a damage tolerance test performed using pin injection and the second group evaluates the functional upset tolerance of equipment when transients are applied to interconnecting cable bundles. Change 3 revisions are provided in three areas: multiple stroke and multiple burst testing applications, clarification of the dielectric withstand voltage tests and clarification of the power line tests. The test requirement table has been revised and new figures are provided for the multiple stroke application, multiple burst application and pin injection calibration setup. Appendix C updates the contact information for the Change Coordinators.

Related Products

RTCA DO-330

RTCA DO-330

Software Tool Qualification Considerations..

$58.00 $115.00

RTCA DO-148A Volume 1

RTCA DO-148A Volume 1

A New Guidance System for Approach and Landing - Volume 1..

$71.00 $142.00

RTCA DO-181E

RTCA DO-181E

Minimum Operational Performance Standards for Air Traffic Control Radar Beacon System/Mode Select (A..

$45.00 $89.00

RTCA DO-160D Change 3

RTCA DO-160D Change 3

Environmental Conditions and Test Procedures for Airborne Equipment..

$49.00 $97.00