• SAE AIR6218
Provide PDF Format

Learn More

SAE AIR6218

  • Constructing Development Assurance Plan for Integrated Systems
  • standard by SAE International, 09/01/2012
  • Publisher: SAE

$37.00$74.00


This SAE Aerospace Information Report (AIR) supplements ARP4754A by identifying the crucial elements to be considered when constructing the development assurance plans described in Chapter 3 (Development Planning) of ARP4754A for integrated systems. This AIR presents a collection of lessons learned from past certification programs involving integrated systems. This AIR is not guidance for system integration technologies.

Related Products

SAE AS91721B

SAE AS91721B

BOLT, MACHINE - DOUBLE HEXAGON EXTENDED WASHER HEAD, DRILLED, PD SHANK, BLACK OXIDE, STEEL, UNS G874..

$37.00 $74.00

SAE J741_200305

SAE J741_200305

Capacity Rating--Scraper, Open Bowl (Cancelled: May 2003)..

$37.00 $74.00

SAE J288_200803

SAE J288_200803

Snowmobile Fuel Tanks..

$37.00 $74.00

SAE AMS3793/10A

SAE AMS3793/10A

Tape and Webbing, Textile, Para-Aramid Intermediate Modulus 5/16 Inch (7.9 mm), 0.053 Ounces per Yar..

$37.00 $74.00