• SAE AMS2375D
Provide PDF Format

Learn More

SAE AMS2375D

  • Control of Forgings Requiring First Article Approval
  • standard by SAE International, 06/13/2007
  • Publisher: SAE

$37.00$74.00


This specification covers procedures for obtaining first-article (preproduction) approval of forgings and the controls to be exercised in producing subsequent production forgings.

This procedure has been used typically for forgings which require preproduction approval and where assurance is required that production lots are of essentially the same metallurgical quality and are produced by the same basic procedures as the forging originally qualified.

Related Products

SAE AMS3695

SAE AMS3695

Adhesive Film, Epoxy-Base For High Durability Structural Adhesive Bonding..

$37.00 $74.00

SAE AS23190B

SAE AS23190B

Wiring, Positioning, and Support Accessories..

$37.00 $74.00

SAE AMSR83248/1A

SAE AMSR83248/1A

Rubber, Fluorocarbon Elastomer, High Temperature, Fluid and Compression Set Resistant (O-Rings, Clas..

$37.00 $74.00

SAE ARP5021A

SAE ARP5021A

Oxygen Cylinder Installation Guide..

$37.00 $74.00