• SAE CMB5A
Provide PDF Format

Learn More

SAE CMB5A

  • Configuration Management Requirements for Subcontractors/Vendors (Stabilized: Oct 2014)
  • standard by SAE International, 10/01/2014
  • Publisher: SAE

$37.00$74.00


The purpose of this Bulleting is to provide a guide for the Buyer in levying tailored CM requirements on his Suppliers; and as a guide for the Suppliers to assist in establishing a management system necessary to satisfy those requirements. through general use of this Bulletin, it is anticipated that:

a. Alll buyers, at any level, can impose more consistent CM requirements on the Suppliers.

b. Suppliers, because of consistent requirements imposed upon them by the Buyers, will be able to use the same internal systems for all supply activity.

c. Because of consistency of requirements and systems, the overall system costs should be reduced.

Related Products

SAE AS3131A

SAE AS3131A

Plug, Expansion - Cres, 303, Short; Std and .010 Oversize Diameters, UNS S30300..

$37.00 $74.00

SAE J2320_201210

SAE J2320_201210

Discharge Signal Lighting System (Stabilized: Oct 2012)..

$37.00 $74.00

SAE AS9599B

SAE AS9599B

BRACKET, ANGLE 90°, CADMIUM PLATED, ALLOY STEEL UNS G41300, .190 X .375 BOLT (Stabilized: Feb 2014)..

$37.00 $74.00

SAE AIR4175A

SAE AIR4175A

A Guide to the Development of a Ground Station for Engine Condition Monitoring..

$37.00 $74.00