• SME AD910280
Provide PDF Format

Learn More

SME AD910280

  • Rapidly Establishing Statistical Process Control (Spc)
  • standard by Society of Manufacturing Engineers, 06/01/1991
  • Publisher: SME

$9.00$18.00


AFTER MANY YEARS OF STATISTICAL PROCESS CONTROL (SPC) TRAINING WITH VERY DISAPPOINTING RESULTS ON THE SHOP FLOOR, A SHIFT WAS MADE TO A USE IT OR LOSE IT PHILOSOPHY, CALLED THE 4RS (RIGHT TIME, RIGHT AMOUNT, RIGHT WAY, RIGHT SUPPORT). WITHIN EIGHT MONTHS, OPERATIONS WERE PLOTTING AND INTERPRETING SPC CHART DATA FOR OVER 80% OF NON-TESTER DATA POINTS ACROSS THE SUBJECT DIVISION. DURING THIS PERIOD, SPC PLANS WERE CREATED, OPERATORS AND ENGINEERING TEAMS WERE TRAINED, AND SPC CHARTS, COMPLETE WITH CONTROL LIMITS, WERE ESTABLISHED. TODAY, OPERATORS ARE IMPROVING PROCESSES AND ELIMINATING BOTH SPECIAL AND COMMON CAUSES OF VARIATION.

Related Products

SME ER96-175

SME ER96-175

Exploring New On-Campus/Off-Campus Programs..

$9.00 $18.00

SME CM98-212

SME CM98-212

Automatic Verification Of Induction Heating Using Eddy Current And Preventive Multi-Frequency Testin..

$9.00 $18.00

SME CM920267

SME CM920267

An Approach To Quality Improvement In Steel Foundry Operation..

$9.00 $18.00

SME IQ96-282

SME IQ96-282

Automated Inspection And Quantification Of Dents In Automotive Bodies Using 3-D Computer Vision Tech..

$9.00 $18.00