• SME MF910273
Provide PDF Format

Learn More

SME MF910273

  • Can You Justify A New Slitting Line?
  • standard by Society of Manufacturing Engineers, 06/01/1991
  • Publisher: SME

$9.00$18.00


THE FINANCIAL JUSTIFICATION PROCEDURE FOR PURCHASING MAJOR CAPITAL EQUIPMENT IS PRESENTED. THE EXAMPLE USED IS EVALUATING THE PURCHASE OF A SLITTING LINE FOR A TUBING PRODUCER. SPECIFICATIONS FOR THE INCOMING AND PRODUCT COILS ARE ANALYZED, AND FROM THAT ANALYSIS THE REQUIREMENTS FOR THE SLITTING LINE ARE ESTABLISHED. NEXT, TOTAL PROJECT COSTS ARE PREPARED AND COMPARED WITH THE PRICES OTHER FIRMS CHARGE FOR PERFORMING THE SAME WORK TO DETERMINE THE PROFIT POTENTIAL FOR THE NEW EQUIPMENT.

Related Products

SME MS900161

SME MS900161

A New Method To Link Cad And Cam System In Application Of Nc Lathe Cam System..

$9.00 $18.00

SME MS900403

SME MS900403

Use Of Knowledge-Based Operation Planning System In..

$9.00 $18.00

SME MS930277

SME MS930277

Business Of Managing Distributed Information Infrastructure..

$9.00 $18.00

SME MS98-264

SME MS98-264

A Model For The Prediction Of Reaction Forces In A 3-2-1 Machining Fixture..

$9.00 $18.00