Provide PDF Format
SME MF98-165
- Elimination Of Downtime Between Coils
- standard by Society of Manufacturing Engineers, 11/01/1998
- Publisher: SME
$9.00$18.00
The average production line loses 20-30% of its productive day due to downtime for coil changes and rethreading. The same equipment can product 20-30% more parts in a day by adding a coil end joiner and a FLOOP (registered) to the line. In addition, continuous running means less scrap, less tool wear, and better quality of parts.