• SME MF98-165
Provide PDF Format

Learn More

SME MF98-165

  • Elimination Of Downtime Between Coils
  • standard by Society of Manufacturing Engineers, 11/01/1998
  • Publisher: SME

$9.00$18.00


The average production line loses 20-30% of its productive day due to downtime for coil changes and rethreading. The same equipment can product 20-30% more parts in a day by adding a coil end joiner and a FLOOP (registered) to the line. In addition, continuous running means less scrap, less tool wear, and better quality of parts.

Related Products

SME AD95-116

SME AD95-116

Water Based Sealing Compound Inducing Systems..

$9.00 $18.00

SME MR99-267

SME MR99-267

Improving The Performance Of Machine Tools With Ptfe (Teflon) Linear Bearing Materials..

$9.00 $18.00

SME EM900667

SME EM900667

Thermoplastic Composites Manufacturing With Commingled..

$9.00 $18.00

SME MR00-197

SME MR00-197

Mechanically And Thermally Coupled Finite Element Analysis Of Chip Formation In Metal Cutting..

$9.00 $18.00