• SME MF98-165
Provide PDF Format

Learn More

SME MF98-165

  • Elimination Of Downtime Between Coils
  • standard by Society of Manufacturing Engineers, 11/01/1998
  • Publisher: SME

$9.00$18.00


The average production line loses 20-30% of its productive day due to downtime for coil changes and rethreading. The same equipment can product 20-30% more parts in a day by adding a coil end joiner and a FLOOP (registered) to the line. In addition, continuous running means less scrap, less tool wear, and better quality of parts.

Related Products

SME MF900210

SME MF900210

Economic Equation For Rotary Draw Bending..

$9.00 $18.00

SME MS920167

SME MS920167

A Computer Vision Based Navigation System For An Unmanned Aerial Vehicle..

$9.00 $18.00

SME MS900693

SME MS900693

Telerobotic Control Of Underwater Vehicles..

$9.00 $18.00

SME MS930127

SME MS930127

The Evolution Of Gaging From Air To Optical Measurement..

$9.00 $18.00