• SME MM920125
Provide PDF Format

Learn More

SME MM920125

  • Can You Justify A New Slitting Line?
  • standard by Society of Manufacturing Engineers, 06/01/1992
  • Publisher: SME

$9.00$18.00


THE FINANCIAL JUSTIFICATION PROCEDURE FOR PURCHASING MAJOR CAPITAL EQUIPMENT IS PRESENTED. THE EXAMPLE USED IS FOR EVALUATING THE PURCHASE OF A SLITTING LINE FOR A TUBING PRODUCER. SPECIFICATIONS FOR THE INCOMING AND PRODUCT COILS ARE ANALYZED, AND FROM THAT ANALYSIS THE REQUIREMENTS FOR THE SLITTING LINE ARE ESTABLISHED. NEXT, TOTAL PROJECT COSTS ARE PREPARED AND COMPARED WITH THE PRICES OTHER FIRMS CHARGE FOR PERFORMING THE SAME WORK TO DETERMINE THE PROFIT POTENTIAL FOR THE NEW EQUIPMENT.

Related Products

SME MR96-116

SME MR96-116

A Study On Deep Hole Metal Boring With Abrasive-Waterjets..

$9.00 $18.00

SME MS900821

SME MS900821

The Closed Loop Assembly Micro-Positioner (Clamp) Docking End Effector For Precision Robotic Assembl..

$9.00 $18.00

SME MS910457

SME MS910457

Aces: Demonstrating The Infrastructure For Concurrent Engineering..

$9.00 $18.00

SME MR95-270

SME MR95-270

Lobing Control In Shoe Centerless Grinding..

$9.00 $18.00