Provide PDF Format
SME MM930238
- Silver Bullets Shoot You Dead: Planning For Integrating Technology, Organization And People Change
- standard by Society of Manufacturing Engineers, 06/01/1993
- Publisher: SME
$9.00$18.00
HIGH FAILURE RATES FOR NEW TECHNOLOGY RESULT FROM INADEQUATE PLANNING FOR INTEGRATING TECHNOLOGY CHANGE WITH ORGANIZATIONAL AND PEOPLE CHANGE. CHARACTERISTICS OF ADEQUATE INTEGRATIVE PLANNING ARE DESCRIBED. TOOLS DO NOT CURRENTLY EXIST FOR PROVIDING IMMEDIATE AND DETAILED INFORMATION ABOUT LIKELY IMPACTS OF ANY CHANGE IN TECHNOLOGY, ORGANIZATION AND PEOPLE ON OTHER ASPECTS OF THE ORGANIZATIONAL SYSTEM. A NEW TOOL, CALLED ACTION, HAS RECENTLY BEEN DEVELOPED BASED ON CLOSE COLLABORATION OF ACADEMIA AND INDUSTRY. A SELECT INDUSTRY EXPERIENCE WITH THE TOOL IS DESCRIBED.
Related Products
SME MR97-226
Wear Mechanism Of An Electroplated Cbn Grinding Wheel During Grinding Of A Nickel Base Alloy With Aq..
$9.00 $18.00
SME MS920300
Knowledge-Based Empowerment Tools Help Achieve A High Performance Organization..
$9.00 $18.00