• SME MR94-253
Provide PDF Format

Learn More

SME MR94-253

  • Utilizing A Systematic Tooling Approach To Increase The Productivity Of Wire Edm
  • standard by Society of Manufacturing Engineers, 06/01/1994
  • Publisher: SME

$9.00$18.00


IN ORDER TO REDUCE PER PART MACHINING COSTS AND REMAIN COMPETITIVE IN TODAYS WORLD MARKET, MANUFACTURERS MUST RETHINK THEIR APPROACH TO PART PRODUCTION. THE OBJECTIVE IS TO MAXIMIZE THE MACHINE UPTIME BY TAKING ADVANTAGE OF EVERY AVAILABLE MACHINING HOUR. THIS IS ESPECIALLY TRUE FOR WIRE EDM BECAUSE OF HIGH CAPITOL COSTS. A SYSTEMATIC APPROACH TO WIRE EDM TOOLING CAN SIGNIFICANTLY REDUCE SET-UP TIME AND INCREASE MACHINE PRODUCTIVITY.

Related Products

SME EM980105

SME EM980105

Hot Drape Forming Of Thermoset Prepegs..

$46.00 $91.00

SME MS95-109

SME MS95-109

Design Of Plant Floor Control Systems With Standard Hardware And Off-The-Shelf Software..

$9.00 $18.00

SME MS920301

SME MS920301

Expert Simulation System For Aiding Material Inventory Control..

$9.00 $18.00

SME FC900639

SME FC900639

Advances In Dual Component Metering For Plastics..

$9.00 $18.00