• SME MS900344
Provide PDF Format

Learn More

SME MS900344

  • Planning For Shop Floor Systems
  • standard by Society of Manufacturing Engineers, 06/01/1990
  • Publisher: SME

$9.00$18.00


AN OVERALL STRATEGY CAN INTEGRATE A MANUFACTURING/ ENGINEERING FACILITY. ATTENTION IS GIVEN TO A BREAKOUT OF THE COSTS NECESSARY TO OPERATE EACH DEPARTMENT. DEPARTMENTS ARE DIVIDED INTO TWO AREAS: OPERATIONS AND OVERHEAD. THE OBJECT IS TO IDENTIFY HIGH COST OR LONG LEAD TIME ELEMENTS. ONCE THIS IS ACCOMPLISHED, COMPUTER TOOLS ARE INTEGRATED INTO THE PRESENT PROCESS TO REDUCE COSTS. THE PAPER DISCUSSES THE METHODOLOGY USED TO FIND THE HIGH-COST ITEMS AND PLANS TO ELIMINATE THE AREAS USING A COMMON SYSTEMS APPROACH.

Related Products

SME MM900721

SME MM900721

Implementing Sensor Systems In Manufacturing: Taking The Right Steps..

$9.00 $18.00

SME FC95-254

SME FC95-254

Powder Booth Fan Performance And Airflow Control..

$9.00 $18.00

SME MR95-181

SME MR95-181

Safe Processes In High-Performance Profile Grinding..

$9.00 $18.00

SME EM900441

SME EM900441

Investment Cast Metal Matrix Composites..

$9.00 $18.00