• SME MS900344
Provide PDF Format

Learn More

SME MS900344

  • Planning For Shop Floor Systems
  • standard by Society of Manufacturing Engineers, 06/01/1990
  • Publisher: SME

$9.00$18.00


AN OVERALL STRATEGY CAN INTEGRATE A MANUFACTURING/ ENGINEERING FACILITY. ATTENTION IS GIVEN TO A BREAKOUT OF THE COSTS NECESSARY TO OPERATE EACH DEPARTMENT. DEPARTMENTS ARE DIVIDED INTO TWO AREAS: OPERATIONS AND OVERHEAD. THE OBJECT IS TO IDENTIFY HIGH COST OR LONG LEAD TIME ELEMENTS. ONCE THIS IS ACCOMPLISHED, COMPUTER TOOLS ARE INTEGRATED INTO THE PRESENT PROCESS TO REDUCE COSTS. THE PAPER DISCUSSES THE METHODOLOGY USED TO FIND THE HIGH-COST ITEMS AND PLANS TO ELIMINATE THE AREAS USING A COMMON SYSTEMS APPROACH.

Related Products

SME EM99-223

SME EM99-223

Pasteurization As A Critical Control Point: The Role Of Iso 9000 With Your Haccp Plan..

$9.00 $18.00

SME AD920232

SME AD920232

Weld Bonding Of Structural Adhesives For Body Stiffening..

$9.00 $18.00

SME MR920364

SME MR920364

Slitting: Past, Present, Future..

$9.00 $18.00

SME MR95-209

SME MR95-209

Problems Of Thermal Damage In Grinding--Development Of A Test Method And The Behavior Of Some Steels..

$9.00 $18.00