• SME MS900481
Provide PDF Format

Learn More

SME MS900481

  • Scheduling Semiconductor Test Operations: Optimization And Approximation
  • standard by Society of Manufacturing Engineers, 06/01/1990
  • Publisher: SME

$9.00$18.00


A METHODOLOGY IS PROPOSED FOR SCHEDULING SEMICONDUCTOR TEST OPERATIONS. WHILE CURRENT PRACTICE IN INDUSTRY IS BASED ON DISPATCHING RULES, OUR METHODOLOGY TAKES A MORE GLOBAL APPROACH. THE FACILITY OR JOB SHOP IS DECOMPOSED INTO A NUMBER OF WORKCENTERS. THE METHODOLOGY PROCEEDS BY SEQUENCING ONE WORKCENTER AT A TIME. A DISJUNCTIVE GRAPH REPRESENTATION OF THE FACILITY MODELS THE INTERACTIONS OF THE WORKCENTERS. ALGORITHMS MINIMIZE MAXIMUM LATENESS AND NUMBER OF TARDY JOBS ON TESTERS AND BATCH PROCESSING MACHINES. THE OVERALL METHODOLOGY HAS BEEN IMPLEMENTED ON A SET OF PROBLEMS BASED ON A REAL INDUSTRY SETTING.

Related Products

SME IQ99-207

SME IQ99-207

Frequency Response Of Analog Probing Systems..

$9.00 $18.00

SME IQ910157

SME IQ910157

Iso 9001 Quality Program Case Study..

$9.00 $18.00

SME MS900749

SME MS900749

Information Resource Management In A Concurrent..

$9.00 $18.00

SME EM920109

SME EM920109

Glcc Teaching Factory..

$9.00 $18.00